Luau-Cazombo-Lumbala Road

ANGOLA

Play Video

Project justification

The municipalities of Luau, Cazombo and Lumbala, in the province of Moxico, are completely isolated during the rainy season due to the poor state of the current roads. For this reason, their rehabilitation is necessary in order to improve travel conditions in the interior of the country and to promote the growth of the region and the quality of life of the population. 

Scope of Works

The scope of the works will include:

  • Rehabilitation of 247 km of the EC192/EN250/EC254/EC382 road, between the localities of Luau and Cazombo and Cazombo and Lumbala.
  • Construction of three bridges on the Luau-Cazombo section and four bridges on the Cazombo-Lumbala section.
  • Vertical signalling.
  • Drainage systems. 
Sustainability

The project will be developed in accordance with the IFC Environmental and Social Performance Standards and national regulations. Its implementation will provide this region with better road communications, connecting the cities and allowing better access to essential services. It will also optimise travel time between these municipalities, as well as improve road safety for drivers. 

For more information about the Project,
get in touch through our Contact Us page.

Scroll to Top

Third Party Risk Management

Our Third-Party Risk Management System is designed to act preventively in identifying third parties and managing associated risks. It is an electronic, automated, and parameterised system integrated into our payment platform, enabling almost instantaneous screening of the reputational and financial aspects of third parties at the contracting stage. In this way, we support the procurement area in identifying the best suppliers in the market—those who share QGMI’s commitment to quality and social responsibility—while reducing our exposure to third-party risk. Our decentralised due diligence process allows the organisation to operate with confidence in the markets where it is present. 

Waste Management

We manage waste in an integrated manner by separating it, processing it through composting, and evaluating its flows. The compost produced is reused in reforestation projects.

GPS Control System

This control system enables operators to level and move earth with greater precision and speed, resulting in increased productivity, lower operating costs, and high-quality results.

SAE (Electronic Monitoring System)

Developed by our IT team, the SAE monitors the activities and working hours of both personnel and equipment in real time, reducing the time required to access performance indicators. It includes an application that reads QR codes assigned to equipment and staff and works even when no network is available. Benefits include improved cost management, enhanced productivity control, and a positive contribution to environmental sustainability.

QGMI Corporate
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.