project justification

QGMI carried out the supply, transport, storage, and installation of over 160,000 metres of steel piles for the Guyana Integrated NGL Plant and the 300 MWe CCGT Power Plant Project, located on the West Bank of the Demerara River in Georgetown, Guyana. The aim of the project was to build all the necessary infrastructure to transport natural gas for its conversion into energy, thereby doubling the country’s electricity generation capacity. 

scope of works
The project included:
  • Supply, transport, storage, and installation of 164,739 metres of steel piles to support the foundations of equipment, tanks, vessels, pipe racks, and buildings for the Guyana Integrated NGL Plant and the 300 MWe CCGT Power Plant Project.
sustainability

The project was developed in line with the highest international standards, in accordance with IFC regulations, the World Bank’s Environmental, Health and Safety Guidelines, and the OECD Common Approaches. 

For more information about the Project,
get in touch through our Contact Us page.

Scroll to Top

Third Party Risk Management

Our Third-Party Risk Management System is designed to act preventively in identifying third parties and managing associated risks. It is an electronic, automated, and parameterised system integrated into our payment platform, enabling almost instantaneous screening of the reputational and financial aspects of third parties at the contracting stage. In this way, we support the procurement area in identifying the best suppliers in the market—those who share QGMI’s commitment to quality and social responsibility—while reducing our exposure to third-party risk. Our decentralised due diligence process allows the organisation to operate with confidence in the markets where it is present. 

Waste Management

We manage waste in an integrated manner by separating it, processing it through composting, and evaluating its flows. The compost produced is reused in reforestation projects.

GPS Control System

This control system enables operators to level and move earth with greater precision and speed, resulting in increased productivity, lower operating costs, and high-quality results.

SAE (Electronic Monitoring System)

Developed by our IT team, the SAE monitors the activities and working hours of both personnel and equipment in real time, reducing the time required to access performance indicators. It includes an application that reads QR codes assigned to equipment and staff and works even when no network is available. Benefits include improved cost management, enhanced productivity control, and a positive contribution to environmental sustainability.

QGMI Corporate
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.