BOLGATANGA-BAWKU-PULMAKOM ROAD

GHANA

Play Video

Project justification

Road safety, reduce travel times, facilitate trade and the movement of goods, stimulate the economic development of the region… The improvement of 109 km of road in the Upper East Region of Ghana will undoubtedly benefit more than 750,000 people directly. 

Scope of Works

The scope of works includes:

  • Reconstruction of the 109 km road, in double surface treatment, except for the first 2 km, paved with asphalt.
  • Construction of a 6 km bypass in Bawku to divert heavy vehicle traffic away from the town centre.
  • Development of three new bridges at the locations of existing bridges at Bolgatanga, Tilli and Bazua. 
Sustainability

At QGMI, we re-designed this project to respect a migratory corridor of elephants passing through the area. We rehabilitated the road according to the IFC’s Environmental and Social Performance Standards. This included conducting biodiversity surveys in key sections of the corridor by a team of researchers from the National University of Science and Technology in Kumasi and the Department of Wildlife and Rangeland Management.

This research in turn forms the basis for measures to protect species living near the corridor. Finally, we implemented some Resettlement Action Plans to adequately compensate people whose land, crops or structures need to be acquired. 

For more information about the Project,
get in touch through our Contact Us page.

Scroll to Top

Third Party Risk Management

Our Third-Party Risk Management System is designed to act preventively in identifying third parties and managing associated risks. It is an electronic, automated, and parameterised system integrated into our payment platform, enabling almost instantaneous screening of the reputational and financial aspects of third parties at the contracting stage. In this way, we support the procurement area in identifying the best suppliers in the market—those who share QGMI’s commitment to quality and social responsibility—while reducing our exposure to third-party risk. Our decentralised due diligence process allows the organisation to operate with confidence in the markets where it is present. 

Waste Management

We manage waste in an integrated manner by separating it, processing it through composting, and evaluating its flows. The compost produced is reused in reforestation projects.

GPS Control System

This control system enables operators to level and move earth with greater precision and speed, resulting in increased productivity, lower operating costs, and high-quality results.

SAE (Electronic Monitoring System)

Developed by our IT team, the SAE monitors the activities and working hours of both personnel and equipment in real time, reducing the time required to access performance indicators. It includes an application that reads QR codes assigned to equipment and staff and works even when no network is available. Benefits include improved cost management, enhanced productivity control, and a positive contribution to environmental sustainability.

QGMI Corporate
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.